Skip to Main Content

Building Safer Connections: Mexico Academy Bridge Install

Jul 30, 2026
| PROJECT NEWS

The Campus Team at Mexico Academy & CSD was onsite for the coordination and installation of a pedestrian bridge located behind Mexico High School.

The existing bridge was removed in one piece, and the new bridge was shop fabricate, galvanized, delivered to the site and installed in one piece.

The removal, delivery and installation took place over two days, and the finished product looks great!


New bridge being lowered by construction equipment in place of existing bridge at Mexico Academy & CSD
Categories: PROJECT NEWS